Archive for the ‘Uncategorized’ Category

Advance Steel Show in San Antonio

February 7, 2017

Check this out!!

http://www.graitec.com/Us/user_group.asp

Advertisements

InfraWorks 360 2016.4

February 9, 2016

Yes, that is correct, a new version.  Autodesk has pushed out the best release of InfraWorks so far.   They have combined the roadway design, drainage design, and bridge design into the software bundle at a great price.  To see some of the new features, watch the video below…

Oct 21st Webcast: Scripting for InfraWorks Part 2 – Autodesk Community

October 14, 2015

Source: Oct 21st Webcast: Scripting for … – Autodesk Community

AutoCAD 2016 Service Pack 1

October 1, 2015

Autodesk has released the AutoCAD 2016 Service Pack 1.

This service pack applies to…

AutoCAD and Verticals Products:

  • AutoCAD 2016
  • AutoCAD Architecture 2016
  • AutoCAD Civil 3D 2016
  • AutoCAD Electrical 2016
  • AutoCAD Map 3D 2016
  • AutoCAD Mechanical 2016
  • AutoCAD MEP 2016
  • AutoCAD P&ID 2016
  • AutoCAD Plant 3D 2016
  • AutoCAD Utility Design 2016

Autodesk Design Suites:

  • Autodesk AutoCAD Design Suite 2016
  • Autodesk AutoCAD with Advance Steel 2016
  • Autodesk Building Design Suite 2016
  • Autodesk Factory Design Suite 2016
  • Autodesk Infrastructure Design Suite 2016
  • Autodesk Plant Design Suite 2016
  • Autodesk Product Design Suite 2016
  • Autodesk Revit Collaboration Suite 2016

Download here.

Changes in Vault Server

May 26, 2015

For those of you using Vault as your data management tool, upgrading is going to be just a little different this time around…

With the introduction of the 2016 Vault Client, and Autodesk Data Management Server (ADMS), the server operating system and SQL will require upgrading. This will mean tight coordination between your I.T. teams and the Total CAD Vault implementation team. Planning is everything. Our recommendation; another server if possible, either VM or an actual temporary system. This will allow for an ADMS server to be built on the temporary system or VM thus providing tools to validate the Vault backups, and installation. Using another (temporary) server we can reduce the impact to the engineering offices. During updates to end-user applications AutoCAD, Inventor, etc. users can be pointed to the temporary server, and continue to work while the real (actual Vault) server is upgraded to the new operating system and SQL. It also allows for the building of the temporary server off-line from the engineering vault server eliminating the down time to engineering in the event of a bad Vault backup, installation failure or the Server op-sys upgrade does not go as planned.

I highly recommend that I.T. teams and engineering teams review the Vault 2016 System Specifications, the link below will direct you to that Web page.

http://knowledge.autodesk.com/support/vault-products/troubleshooting/caas/sfdcarticles/sfdcarticles/System-requirements-for-Autodesk-Vault-products.html

Happy Vaulting

Mike